RDF installation Birmingham UK
A RDF installation with an input of 30/40 t/h of MSW waste, where the light fraction is taken out and being used as RDF waste.
A RDF installation with an input of 30/40 t/h of MSW waste, where the light fraction is taken out and being used as RDF waste.